Utran Gas Based Power Station

The Utran Gas Based Power Station is located on the bank of Tapi River near Surat.  It is a Gas Based Power Station.  There are two Projects – CCPP – 1 & CCPP – 2. In CCPP – 1 there are three gas turbine units of 30 MW each and one unit of 45 MW STG with a total installed capacity of 135 MW. In CCPP – 2 , there is one GT of 228 MW & one STG of 147 MW with a total installed capacity of 375 MW. The units of CCPP-1  are of BHEL make & the units of CCPP – 2 are of ALSTOM make. Commissioning dates of units of CCPP – 1 : GT#1, GT#2, GT#3 and STG are 17.12.1992, 28.12.1992, 07.05.1993 and 17.07.1993 respectively & CCPP – 2 : GT – 10.07.2009 &  STG – 10.10.2009. The CCPP – 2 is taken under commercial operation since 08.11.2009.

 

 

 

YEAR

CCPP – 1

CCPP - 2

GEN (MUs)

PLF (%)

GEN (MUs)

PLF (%)

2004-05

1175

99.37

-

-

2005-06

1077

91.11

-

-

2006-07

1056

89.28

-

-

2007-08

995

83.93

-

-

2008-09

870

73.55

-

-

2009-10

866

73.21

967

74.74

 

 

 
  Home | Disclaimer | Privacy Policy | Terms of use | Contact us | Sitemap             ©2007 GSECL. All Rights Reserved.