The Utran Gas
Based Power Station is located on the bank of Tapi River near
Surat. It is a Gas Based Power Station. There are two Projects
– CCPP – 1 & CCPP – 2. In CCPP – 1 there are three gas turbine
units of 30 MW each and one unit of 45 MW STG with a total
installed capacity of 135 MW. In CCPP – 2 , there is one GT of
228 MW & one STG of 147 MW with a total installed capacity of
375 MW. The units of CCPP-1 are of BHEL make & the units of
CCPP – 2 are of ALSTOM make. Commissioning dates of units of
CCPP – 1 : GT#1, GT#2, GT#3 and STG are 17.12.1992, 28.12.1992,
07.05.1993 and 17.07.1993 respectively & CCPP – 2 : GT –
10.07.2009 & STG – 10.10.2009. The CCPP – 2 is taken under
commercial operation since 08.11.2009.