UKAI
Thermal & HYDRO Power Station |
The Ukai Thermal Power Station
is located near Ukai Dam on Tapi River in Tapi District. It is
a Coal Based Power Station. There are two units of 120 MW each
(Unit no. 1 & 2), two units of 200 MW each (Unit no. 3 & 4) and
one unit of 210 MW (Unit no. 5) with a total installed capacity
of 850 MW. All the above units are of BHEL make. Commissioning
dates of unit no. 1 to 5 are 19.03.1976, 23.06.1976, 21.01.1979,
11.09.1979 and 30.01.1985 respectively. The major R & M of unit
no. 1 & 2 is completed.
|
 |
|
|
YEAR |
|
PLF (%) |
| |
|
|
|
2004-05 |
5063 |
68.00 |
|
2005-06 |
5363 |
72.03 |
|
2006-07 |
4813 |
64.64 |
| |
5063 |
67.81 |
|
2008-09 |
4835 |
64.94 |
|
2009-10 |
4829 |
64.85 |
|
|
UKAI
Hydro Power Station |
|
|
The Ukai Hydro Power Station is
located at Ukai Dam on Tapi River in Tapi District. There are four
units of hydro turbine each of 75 MW with a total installed capacity
of 300 MW. All the above units are of BHEL make. Commissioning
dates of unit no. 1 to 4 are 08.07.1974, 13.12.1974, 22.04.1975 and
04.03.1976 respectively.
|
|
| |
| |
UKAI
lbc Hydro Power Station |
| |
The Ukai Left Bank Canal (LBC
)Hydro Power Station is located at Left Bank Cannel of Ukai Dam
on Tapi River in Tapi District. There are two units of hydro
turbine each of 2.5 MW with a total installed capacity of 5 MW.
All the above units are of BHEL make. Commissioning dates of
unit no. 1 and 2 are 08.12.1987 and 19.02.1988 respectively. |
|
| |